All vinyl siding and vinyl soffit and fascia can be cut with tin snips a circular saw with a plywood blade or by scoring it with a knife and breaking it.
How to start vyinl siding.
When cutting vinyl siding it s usually to go into a corner.
Vinyl siding starter strips.
Not just another vinyl siding installation video.
If you don t cut your siding short when it expands in the summer it s going to buckle.
1 2 inch 1 3 cm plywood or osb are common substrates and these are generally covered with roofing felt or another moisture barrier prior to siding the walls.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
Starting with the soffit nail.
Longer siding panels don t stretch as readily as smaller ones so they re not as easy to adjust if they get out of whack.
Whatever your measurement is take at least 1 4 or 1 8 on both sides for the panel to slide back and forth.
Remove any siding or exterior finish that isn t compatible with vinyl siding and make sure the walls are sheathed with a substrate to receive the siding.
Refer to important notes for more information on water resistive barriers.
When installing vinyl siding on each side of a window or door start on the side that needs the longer panels.
Consult your local.
Unless already installed a water resistive barrier should be applied to the house prior to installing vinyl siding.
This is where the new siding will begin.
This is our most comprehensive.
A flat level wall surface is necessary for proper installation of vinyl siding.
You need to leave at least 1 4.
Power saw bench or radial arm saw.
Utility knife score panel with knife then bend the vinyl back and forth until it snaps cleanly on the scored line.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Install flashing before starting to apply the siding.